I-5 reopens after mudslide blocks freeway in central Bellingham

A raft of mud slid onto Interstate 5 early Sunday, October 27, as rains hammered Bellingham, leading to a roughly 10-hour closure of the arterial route. Since the turn of the 21st century, there has not been an hour that has come close to the total of 1.42 inches that fell shortly before the slide. Bond is quoted.

Read here.